Fission Hits Widest Mineralization to Date Outside of the R780E Zone with 1.5km Step Out from Triple R Deposit
Hole PLS17-564 in R1515W Zone intersects 135.5m of total comp mineralization, including 8.25m total comp >10,000 cps and multiple intervals of >65,535 cps